• Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ

Olof Simren - Microsoft Dynamics 365 Business Central Blog

  • Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ

Posting of Actual and Expected Production Time

Aug 25, 2015

When implementing Microsoft Dynamics NAV in a manufacturing environment this question is always discussed; should the time posted against production orders be according to the expected values (e.g. the setup and run times in the routings, sometimes also referred to as nominal values) or should it be according to the actual time (entered by a user)? In my mind the answer to this should be driven by business requirements and should not be determined by the functionality available in a software (just like many other things when it comes to implementing an ERP system). My experience is that 3 out...

Assembly Order Posting to General Ledger

Jul 20, 2015

I have previously described how production orders are posting into the general ledger which I have received a lot of positive feedback on. This time I will described how assembly orders are posting into the general ledger in Microsoft Dynamics NAV (which is a lot simpler). The assembly orders in Microsoft Dynamics NAV was introduced in the 2013 version and they are a great compliment to the production orders, you can read one of my previous blog posts about assembly vs. production orders to get a feeling about what to use when. The only thing on assembly orders that creates entries...

Consignment Inventory

Apr 26, 2015

Being able to handle consignment inventory in Microsoft Dynamics NAV is a common requirement. There are four scenarios of consignment inventory that I frequently bump into; 1. Inventory at a Customer 2. Inventory at a Vendor 3. Customer Owned Inventory 4. Vendor Owned Inventory Some may argue that case 2 and 3 is not consignment, and they might be right, but nevertheless they are cases that needs to be handled and to me the overall concept is closely related to consignment inventory and therefor I included them here. Case 2 and 3 are typically found in relation to subcontracting or...

Subcontracting Part 1: The Basics

Aug 5, 2014

This is the first part of a series of blog posts about the subcontracting functionality in Microsoft Dynamics NAV. It describes how to setup and use the basic functionality, which is something that is very common to use for manufacturers (3 out of 4 places I go to uses some kind of subcontractors to perform operations that they can’t or don’t want to do in-house). Future posts on the subject subcontracting will describe things like how to ship the products to the subcontractor in a proper way, how shipping charges can be applied, how to receive subcontracted parts using warehouse...

Total Cost Allocation for Multiple Outputs

Jul 29, 2014

To allocate the total costs posted against a production order towards multiple outputs is a bit tricky in standard Microsoft Dynamics NAV, you more or less have to manually separate the different costs and post them against each of the production order lines (this since the cost calculations in Dynamics NAV is per production order line). For material and capacity costs this involves dividing the quantities consumed and times spent between the production order lines and then post them individually against each of the lines. And for subcontracting costs it is more or less impossible (although nothing is impossible in...

The Low-Level Code

Jun 4, 2014

Do you know what the low-level code in Microsoft Dynamics NAV is used for? And do you know how it is maintained? The low-level codes are critical for Dynamics NAV to function properly in a manufacturing environment where material planning takes place (which is in 9 out of 10 places). In addition to this, the cost adjustments in Dynamics NAV are also using the low-level codes. The low-level code is a field in the item table that represents the items lowest level of usage in the production BOM or assembly BOM structures. It is used internally by Dynamics NAV to determine...

Cost Roll-Up Details on the Item Card

May 22, 2014

Here is a super simple, but very useful modification for displaying the rolled-up costs on the item card in Microsoft Dynamics NAV. The item table has 10 standard fields that contain the rolled-up costs that are calculated during a regular standard cost roll-up. Those fields are not by default added to the item card; just adding them is quick and adds lots of values to the users that are looking at the costs shares of items. (more…)

Production Order Posting to General Ledger

May 20, 2014

How Microsoft Dynamics NAV posts into the general ledger from production orders is something that you must know when implementing it in a manufacturing environment. It is critical in order to get the posting groups and their related accounts correctly defined. This blog post will focus on the general ledger accounts and the amounts, for details about what dimensions that are used, see my previous post; Dimensions on Production Orders. The examples that are described are using the expected cost posting (setup in the inventory setup), which to me is the preferred way to setup Dynamics NAV. Without the expected cost posting...

BOM Cost Share Distribution Report

May 14, 2014

One of the new reports in Microsoft Dynamics NAV 2013 is the BOM Cost Share Distribution Report that came with the assembly functionality. It is a great looking report, and what makes it even better is that it does not only work with assembled items but also with manufactured items. (more…)

Discrepancy Between Purchase and Direct Cost Applied

May 8, 2014

In school we where told that when you invoice (voucher) received inventory you get a debit transaction against the inventory account and a credit transaction against the accounts payable. Well, in Microsoft Dynamics NAV you also get two transactions in the P&L, a debit against the purchase account and a credit against the direct cost applied account. What are those used for? Wouldn’t they always be the same and net each-other out? Not necessarily. There is a special case to consider where the two transactions in the P&L are not the same and therefore a discrepancy between the two accounts will occur....

  • 1
  • 2

Subscribe to My Blog via Email

Check Out Our Apps in AppSource

My Dynamics NAV Partner

Naviona, LLC

Categories

  • Assembly (3)
  • Development (35)
  • Finance (14)
  • General (28)
  • Inventory (24)
  • Manufacturing (36)
  • Miscellaneous (27)
  • Purchase (9)
  • Sales (11)
  • Warehouse (7)

Tags

.net Add-in AI AppSource Assembly Assembly BOM Business Central CAL Capacity Consumption Contact Copilot Costs Customer Development Dimensions Excel Finance Flushing General Ledger Inventory Item Item Tracking Low-Level Code MRP NAV 2015 NAV 2016 Output Planning Production Production BOM Production Orders Purchase Orders Receipts Reporting Reports Routing Sales Sales Order Stockkeeping Unit Subcontracting Task List Warehouse Warehouse Shipment Work Center

Recent Posts

  • Business Central Configuration Audit using Vibe Coding
  • Copilot in Planning Parameter Worksheet
  • Copilot in Planning Worksheet
  • Copilot Inventory Queries
  • Record Deletion Tool for Business Central in AppSource
  • Reopen Finished Production Orders
  • XML Buffer and CSV Buffer Tables
  • Functionality Improvements in NAV 2017
  • Reversing Production Output and Consumption
  • Return Merchandise Authorization (RMA)

Categories

  • Assembly
  • Development
  • Finance
  • General
  • Inventory
  • Manufacturing
  • Miscellaneous
  • Purchase
  • Sales
  • Warehouse

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message

Categories

  • Assembly (3)
  • Development (35)
  • Finance (14)
  • General (28)
  • Inventory (24)
  • Manufacturing (36)
  • Miscellaneous (27)
  • Purchase (9)
  • Sales (11)
  • Warehouse (7)

Tags

.net Add-in AI AppSource Assembly Assembly BOM Business Central CAL Capacity Consumption Contact Copilot Costs Customer Development Dimensions Excel Finance Flushing General Ledger Inventory Item Item Tracking Low-Level Code MRP NAV 2015 NAV 2016 Output Planning Production Production BOM Production Orders Purchase Orders Receipts Reporting Reports Routing Sales Sales Order Stockkeeping Unit Subcontracting Task List Warehouse Warehouse Shipment Work Center

Recent Posts

  • Business Central Configuration Audit using Vibe Coding
  • Copilot in Planning Parameter Worksheet
  • Copilot in Planning Worksheet
  • Copilot Inventory Queries
  • Record Deletion Tool for Business Central in AppSource
  • Reopen Finished Production Orders
  • XML Buffer and CSV Buffer Tables
  • Functionality Improvements in NAV 2017
  • Reversing Production Output and Consumption
  • Return Merchandise Authorization (RMA)

Recent Comments

  • Olof on Business Central Configuration Audit using Vibe Coding
  • Andrew Trayfoot on Business Central Configuration Audit using Vibe Coding
  • Barrett Allen on Reopen Finished Production Orders
  • Kateryna on Business Central Configuration Audit using Vibe Coding
  • Takeshi Setoya on Reopen Finished Production Orders
  • Steve on Consignment Inventory
  • Olof Simren on Copilot in Planning Worksheet
  • Omaer Amjad on Copilot in Planning Worksheet

© 2026 · Olof Simren

  • Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ