• Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ

Olof Simren - Microsoft Dynamics 365 Business Central Blog

  • Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ

Consignment Inventory

Apr 26, 2015

Being able to handle consignment inventory in Microsoft Dynamics NAV is a common requirement. There are four scenarios of consignment inventory that I frequently bump into; 1. Inventory at a Customer 2. Inventory at a Vendor 3. Customer Owned Inventory 4. Vendor Owned Inventory Some may argue that case 2 and 3 is not consignment, and they might be right, but nevertheless they are cases that needs to be handled and to me the overall concept is closely related to consignment inventory and therefor I included them here. Case 2 and 3 are typically found in relation to subcontracting or...

Subcontracting Part 5: Perform Subcontracting

Sep 17, 2014

This is the fifth post on my blog related to subcontracting in Microsoft Dynamics NAV. It describes how you can setup and use Dynamics NAV when you are performing subcontracting on behalf of a customer (e.g. if you are a subcontractor for a customer and perform operations on parts belonging to the customer). This is actually quite straight forward. The key is to create separate items that represent the customer’s parts. Whatever is received from the customer as components should not have an inventory value and whatever is sent back to the customer should have a value representing the value...

Subcontracting Part 4: Warehouse Receipts

Sep 3, 2014

This is the fourth post related to subcontracting in Dynamics NAV. The topic is how to use warehouse receipts together with subcontracting purchase orders (previous parts are here: Part 1, Part 2, Part 3). It is a quite common requirement to be able to use the warehouse receipts to process receipts of subcontracting purchase orders. It could for example be that your location is setup to use the ‘Directed Put-Away and Pick’ (sometimes referred to as advanced warehousing) and therefore you are required to use the warehouse receipts or it could simply be that the warehouse receipts are used standalone...

Subcontracting Part 3: Transport Charges

Aug 22, 2014

This is the third post in a series of subcontracting blog posts, and it starting to get a bit tricky. The topic is how to handle transport charges for subcontracting operations. In other words if you have a vendor that handles parts of the production process and you receive an invoice from a shipping agent/transportation company for the transportation of products either to and/or from the subcontractor. If you haven’t read part 1 and part 2 it might be a good idea to read those first, this post assumes you know the basics of subcontracting and uses the same items...

Subcontracting Part 2: Shipping Components to Subcontractors

Aug 11, 2014

This describes how to ship components to a subcontractor as part of a subcontracting process in Microsoft Dynamics NAV. It is a frequently asked question, so I thought it deserved its own blog post. As the title indicates, this is a second post in a series of posts related to subcontracting. It might make sense to read part 1 first since this kind of built on top of it (using the same items, etc.). The key to shipping components to a subcontractor is to create a location that represent the vendor location and use transfer orders to ship the components....

Subcontracting Part 1: The Basics

Aug 5, 2014

This is the first part of a series of blog posts about the subcontracting functionality in Microsoft Dynamics NAV. It describes how to setup and use the basic functionality, which is something that is very common to use for manufacturers (3 out of 4 places I go to uses some kind of subcontractors to perform operations that they can’t or don’t want to do in-house). Future posts on the subject subcontracting will describe things like how to ship the products to the subcontractor in a proper way, how shipping charges can be applied, how to receive subcontracted parts using warehouse...

Total Cost Allocation for Multiple Outputs

Jul 29, 2014

To allocate the total costs posted against a production order towards multiple outputs is a bit tricky in standard Microsoft Dynamics NAV, you more or less have to manually separate the different costs and post them against each of the production order lines (this since the cost calculations in Dynamics NAV is per production order line). For material and capacity costs this involves dividing the quantities consumed and times spent between the production order lines and then post them individually against each of the lines. And for subcontracting costs it is more or less impossible (although nothing is impossible in...

Production Order Posting to General Ledger

May 20, 2014

How Microsoft Dynamics NAV posts into the general ledger from production orders is something that you must know when implementing it in a manufacturing environment. It is critical in order to get the posting groups and their related accounts correctly defined. This blog post will focus on the general ledger accounts and the amounts, for details about what dimensions that are used, see my previous post; Dimensions on Production Orders. The examples that are described are using the expected cost posting (setup in the inventory setup), which to me is the preferred way to setup Dynamics NAV. Without the expected cost posting...

Subscribe to My Blog via Email

Check Out Our Apps in AppSource

My Dynamics NAV Partner

Naviona, LLC

Categories

  • Assembly (3)
  • Development (35)
  • Finance (14)
  • General (28)
  • Inventory (24)
  • Manufacturing (36)
  • Miscellaneous (27)
  • Purchase (9)
  • Sales (11)
  • Warehouse (7)

Tags

.net Add-in AI AppSource Assembly Assembly BOM Business Central CAL Capacity Consumption Contact Copilot Costs Customer Development Dimensions Excel Finance Flushing General Ledger Inventory Item Item Tracking Low-Level Code MRP NAV 2015 NAV 2016 Output Planning Production Production BOM Production Orders Purchase Orders Receipts Reporting Reports Routing Sales Sales Order Stockkeeping Unit Subcontracting Task List Warehouse Warehouse Shipment Work Center

Recent Posts

  • Business Central Configuration Audit using Vibe Coding
  • Copilot in Planning Parameter Worksheet
  • Copilot in Planning Worksheet
  • Copilot Inventory Queries
  • Record Deletion Tool for Business Central in AppSource
  • Reopen Finished Production Orders
  • XML Buffer and CSV Buffer Tables
  • Functionality Improvements in NAV 2017
  • Reversing Production Output and Consumption
  • Return Merchandise Authorization (RMA)

Categories

  • Assembly
  • Development
  • Finance
  • General
  • Inventory
  • Manufacturing
  • Miscellaneous
  • Purchase
  • Sales
  • Warehouse

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message

Categories

  • Assembly (3)
  • Development (35)
  • Finance (14)
  • General (28)
  • Inventory (24)
  • Manufacturing (36)
  • Miscellaneous (27)
  • Purchase (9)
  • Sales (11)
  • Warehouse (7)

Tags

.net Add-in AI AppSource Assembly Assembly BOM Business Central CAL Capacity Consumption Contact Copilot Costs Customer Development Dimensions Excel Finance Flushing General Ledger Inventory Item Item Tracking Low-Level Code MRP NAV 2015 NAV 2016 Output Planning Production Production BOM Production Orders Purchase Orders Receipts Reporting Reports Routing Sales Sales Order Stockkeeping Unit Subcontracting Task List Warehouse Warehouse Shipment Work Center

Recent Posts

  • Business Central Configuration Audit using Vibe Coding
  • Copilot in Planning Parameter Worksheet
  • Copilot in Planning Worksheet
  • Copilot Inventory Queries
  • Record Deletion Tool for Business Central in AppSource
  • Reopen Finished Production Orders
  • XML Buffer and CSV Buffer Tables
  • Functionality Improvements in NAV 2017
  • Reversing Production Output and Consumption
  • Return Merchandise Authorization (RMA)

Recent Comments

  • Olof on Business Central Configuration Audit using Vibe Coding
  • Andrew Trayfoot on Business Central Configuration Audit using Vibe Coding
  • Barrett Allen on Reopen Finished Production Orders
  • Kateryna on Business Central Configuration Audit using Vibe Coding
  • Takeshi Setoya on Reopen Finished Production Orders
  • Steve on Consignment Inventory
  • Olof Simren on Copilot in Planning Worksheet
  • Omaer Amjad on Copilot in Planning Worksheet

© 2026 · Olof Simren

  • Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ