Maintenance Production Orders

March 24, 2015 Posted by Olof Simren Manufacturing 4 Comments

A way to handle maintenance on machines in Microsoft Dynamics NAV is to create production orders with operations that represent the maintenance. The beauty of this is that you can then include the maintenance when scheduling the production orders, you also maintain history about when the maintenance was done and you have the option to capture the labor cost related to maintenance.

Below is an example of how it can be done.

Assume we want to be able to schedule maintenance on a cutting machine (I use the same machine center setup as in my previous blog post Work Centers vs. Machine Centers). For this I create a separate item, I give it the item number ‘MAIN-CUT’ and a description ‘Maintenance on Cutting Machine’. The only purpose of this item is performing maintenance on the cutting machine(s).

Maintenance-Item-Card-Dynamics-NAV

It should not have any inventory value assigned to it, unfortunately setting the inventory value zero checkbox on the item card does not work for manufactured items, so the other option is to set it up with the costing method as standard cost and with 0 as the cost.

Maintenance-Item-Card-Costing-Method-Dynamics-NAV

If you want to capture the labor cost related to the maintenance then the labor cost will all be posted into the P&L as a variance since the standard cost of the item is 0. For analytical purpose it then makes sense to also add a dimension value to the item that tags the g/l entries as maintenance related. Normally you have some kind of item group or product category dimension already for items, if that is the case you just have to add a value for maintenance and setup the item to use this dimension value (read more about dimensions on production orders).

Maintenance-Default-Dimension-Dynamics-NAV

Next we need to define a routing to go onto the maintenance production order. Too keep this simple we just create one with the same number as the item and add one operation on the CUT work center on the on the routing line. For the operation we can add standard tasks, tools, comments, etc. just like with regular routings. I define the setup time as 3 hours since that is what the maintenance will take.

Maintenance-Routing-Dynamics-NAV

Now we have what we need. Correct, there is no need for a production BOM. You could add one if you plan to use some inventory during the maintenance, but in this case we will do it without.

Now you can create maintenance production order as you want (don’t forget to link the routing with the item first). Maybe you want to do maintenance once a month and create them all for the year, or you just want to create them as needed.

You create the maintenance production order same way as if you would create a regular production order manually (e.g. enter the item number, quantity, due date and location then refresh). Typically you want to create it with a quantity of 1.

Maintenance-Production-Order-Dynamics-NAV

Now the maintenance production order will show up on the task list among the regular production orders. You can release them, load your shop floor, move them around, etc. the same as regular production orders. The load on the work/machine center will include the maintenance order and the available capacity will be reduced accordingly. Nice! 🙂

Work-Center-Load-Dynamics-NAV

The job card can contain the instructions entered on the routing (or if you enter additional information on the production order itself), just like regular production orders, nothing magic about this.

The maintenance production order is also completed the same way as you do your regular production orders (through the output journal, production journal, a barcode system, etc..). This is kind of nice as well since you don’t need separate procedures or instructions for this.

What you then see in the general ledger is the labor cost related to the maintenance being posted onto the variance accounts with the maintenance dimension value.

Maintenance-Cost-In-PL-Dynamics-NAV

You see in the capacity ledger entries when maintenance was last done on the work/machine centers. And if you want to take it even further you can enter maintenance information or link documents to the production order (to have a complete record of the maintenance accessible from Dynamics NAV).

This is to me an easy way to manage (schedule and record) maintenance within standard Dynamics NAV.

Note that you will end up with some inventory without a value on the items, so this is something you want to adjust out periodically (don’t want to confuse people during stock counts 🙂 ).

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Related


Discover more from Olof Simren - Microsoft Dynamics 365 Business Central Blog

Subscribe to get the latest posts sent to your email.

Tags: ProductionProduction OrdersRoutingScheduling
4 Comments
Share
5

About Olof Simren

I am a Microsoft Dynamics NAV and 365 Business Central Expert, I started implementing Microsoft Dynamics NAV in 2002, back then it was called Navision Attain. Throughout the years there has been many exciting implementations in different parts of the world, all of them with different challenges but with one common theme; manufacturing. As a consultant, I bring over 20 years of experience in implementing Microsoft Dynamics NAV and 365 Business Central within manufacturing and distribution companies. The services I offer includes project management, consultation, development and training. Feel free to contact me if you need help with anything related to Microsoft Dynamics NAV or 365 Business Central. I work through my company Naviona where I team up with other skilled Microsoft Dynamics NAV and 365 Business Central Experts.

You also might be interested in

Scrap in Production

Jul 16, 2014

Microsoft Dynamics NAV has multiple ways in which you can[...]

Flushing Methods

Feb 10, 2014

An old but still relevant topic is the different flushing[...]

Production Order Posting to General Ledger

May 20, 2014

How Microsoft Dynamics NAV posts into the general ledger from[...]

4 Comments

Leave your reply.
  • Dario
    · Reply

    March 25, 2015 at 5:08 AM

    Nice Trick

  • Siva
    · Reply

    June 24, 2015 at 11:32 AM

    Hi Olof,

    Thanks for a very nice article.

    I can’t find how the G/L entry created for $90. Did you key in the amount $90 on output journal Unit cost field? or Work center – Direct Unit cost field or Overhead rate field?
    Could you please explain.

    Thanks in advance.
    Siva

    • Olof Simren
      · Reply

      Author
      June 24, 2015 at 3:59 PM

      Hi Siva,
      The amount is the capacity costs, in my example it was simply the time entered in the output journal together with the cost on the work center.

      /Olof

      • Siva
        · Reply

        June 30, 2015 at 9:39 PM

        Hi Olof,

        Thanks you for your prompt reply, I Acquired it.

        Regards,
        Siva.

Leave a Reply

Your email is safe with us.
Cancel Reply

Subscribe to My Blog via Email

Check Out My Apps in AppSource

My Dynamics NAV Partner

Naviona, LLC

Categories

  • Assembly (3)
  • Development (35)
  • Finance (14)
  • General (28)
  • Inventory (25)
  • Manufacturing (37)
  • Miscellaneous (28)
  • Purchase (10)
  • Sales (11)
  • Warehouse (7)

Tags

.net Add-in AI AppSource Assembly Assembly BOM CAL Capacity Consumption Convergence 2015 EMEA Copilot Costs Customer Development Dimensions Excel Finance General Ledger Inventory Item KCP Dynamics MRP NAV 2013 NAV 2015 NAV 2016 Output Planning Production Production BOM Production Orders Purchase Orders Quality Reports Routing Sales Order Scrap Security Stockkeeping Unit Subcontracting Task List Warehouse Warehouse Put-away Warehouse Receipt Warehouse Shipment Work Center

Recent Posts

  • Quality Management in Business Central Version 28
  • Business Central Configuration Audit using Vibe Coding
  • Copilot in Planning Parameter Worksheet
  • Copilot in Planning Worksheet
  • Copilot Inventory Queries
  • Record Deletion Tool for Business Central in AppSource
  • Reopen Finished Production Orders
  • XML Buffer and CSV Buffer Tables
  • Functionality Improvements in NAV 2017
  • Reversing Production Output and Consumption

Categories

  • Assembly
  • Development
  • Finance
  • General
  • Inventory
  • Manufacturing
  • Miscellaneous
  • Purchase
  • Sales
  • Warehouse

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message

Categories

  • Assembly (3)
  • Development (35)
  • Finance (14)
  • General (28)
  • Inventory (25)
  • Manufacturing (37)
  • Miscellaneous (28)
  • Purchase (10)
  • Sales (11)
  • Warehouse (7)

Tags

.net Add-in AI AppSource Assembly Assembly BOM CAL Capacity Consumption Convergence 2015 EMEA Copilot Costs Customer Development Dimensions Excel Finance General Ledger Inventory Item KCP Dynamics MRP NAV 2013 NAV 2015 NAV 2016 Output Planning Production Production BOM Production Orders Purchase Orders Quality Reports Routing Sales Order Scrap Security Stockkeeping Unit Subcontracting Task List Warehouse Warehouse Put-away Warehouse Receipt Warehouse Shipment Work Center

Recent Posts

  • Quality Management in Business Central Version 28
  • Business Central Configuration Audit using Vibe Coding
  • Copilot in Planning Parameter Worksheet
  • Copilot in Planning Worksheet
  • Copilot Inventory Queries
  • Record Deletion Tool for Business Central in AppSource
  • Reopen Finished Production Orders
  • XML Buffer and CSV Buffer Tables
  • Functionality Improvements in NAV 2017
  • Reversing Production Output and Consumption

Recent Comments

  • Olof on Business Central Configuration Audit using Vibe Coding
  • Andrew Trayfoot on Business Central Configuration Audit using Vibe Coding
  • Barrett Allen on Reopen Finished Production Orders
  • Kateryna on Business Central Configuration Audit using Vibe Coding
  • Takeshi Setoya on Reopen Finished Production Orders
  • Steve on Consignment Inventory
  • Olof Simren on Copilot in Planning Worksheet
  • Omaer Amjad on Copilot in Planning Worksheet

© 2026 · Olof Simren

  • Home
  • About Me
  • Contact Me
  • Downloads
  • White Papers
  • Web Sites
  • Post List
  • Articles
  • FAQ
Prev Next